Weiming has established long-term strategic cooperation with design institutes, construction and installation enterprises, and equipment suppliers. Our subordinated equipment manufacturers are also able to provide essential waste incineration equipment to achieve synchronous equipment supply for the project development. We have also trained a group of highly experienced construction team who, through scientific project management, project approval planning, and design and construction scheme, are there to ensure engineering quality, control construction cost, and minimize project construction time.
Dongzhuang Power Plant, Phase I of Linjiang Power Plant, and Phase I of Kunshan Power Plant, all invested and constructed by Weiming Environment Protection, are completed in 10 months, 15 months, and 14 months respectively. In 2009, the construction of Qionghai Waste Power Plant in Hainan Province in the form of EPC general contracting commenced and completed in the same year, creating the record of shortest construction duration in comparison with the construction of other power plants with the similar scale. Shortened construction period also cuts down construction cost and effectively cuts down the total investment needed.